Free tool · For students, technicians & course leaders
The degree show planner
Work out how much wall your show needs, pick a layout, get hanging heights right and keep track of every job from booking to opening night. Free, with no sign-up.
How much wall do you need?
Start with rough numbers. You can refine them as you go.
Exhibitors
Students or artists showing workWorks per exhibitor
Pieces that need wall spaceAverage work width
Including the frameSpace between works
50–60 cm is a good minimumLayout
Your show needs about
— panels
- Wall per exhibitor
- Both sides hung?
- Support returns
- 1 for every 3 panels
- Recommended for this size
- Estimated hire, 1 week, inc. install
Based on 1 m wide panels and standard transport within 150 miles of Birmingham. Walls are freestanding and need a return panel for support. In bays and islands the returns can be hung too, so your final layout may need fewer panels. We'll check when we draw it.
Pick a layout
Bays
One bay per student. The classic degree show layout.
Short walls come off a spine to give each exhibitor their own bay. Work hangs on both sides of the dividers, and the dividers act as the support returns. Best for large group shows.
Zigzag
Lots of wall in a narrow room.
Walls set at angles down the room give far more hanging space than the room's own walls, and visitors can still see through. Both faces can be hung.
Corridor
Small shows and long spaces.
Two parallel runs of wall make a gallery corridor. Work hangs on the inner faces only, so it needs more panels than the other layouts.
Islands
Open halls and art fairs.
Freestanding blocks of walls placed around an open floor. Every face can be hung, and visitors walk all the way round.
Hang it like a gallery
- Centre line at about 145 cm from the floor. Line up the middle of every piece to it, whatever its size.
- Leave at least 50–60 cm between works so each one has room.
- Leave 30 cm or more at the end of every wall, so work doesn't run into the corner.
- Light from above at about 30° to the wall to cut glare on glazed work.
- Use one type of fixing (screws, pins or nails) so the wall looks consistent.
When to do what
- Oct – DecConfirm the space and how many exhibitors you'll have. Get the venue's floor plan.
- Jan – MarBook your walls. Summer dates fill up first. Get layout drawings approved by the venue.
- AprilGive each exhibitor their wall space. Order lighting, labels and vinyl.
- May – JuneWalls go in, the work goes up, and the show opens.
- AfterTake the work down. We collect the walls and leave the space clear.
Show checklist
0 of 11 doneFor course leaders & technicians
Share it with your students
You're welcome to link to this planner from your course pages, show guides or student intranet. It's free, has no sign-up and will stay that way.
